Four surfaces. One decision loop.
Explore the universe. Ask a capital question. Stress a bind. Write the recommendation. Monitor what changes after you decide. That loop is the product.
The explorer above is a sample of the records Atlas draws on — examples, not the full catalog. Each source stays at its available grain and cadence. Gaps, irregular updates, and bias remain part of the system's limits — and of every report we write.
How it works
Four surfaces. One decision loop.
01 · Explore
Explore
Search the infrastructure universe — projects, markets, sponsors, nodes, and load books — without treating a printed pile as a named roster.
What this holds
Four surfaces. One decision loop.
Dependencies move together. A project is not a spreadsheet of independent columns.
Interconnection and equipment are not independent; neither are permits and construction. Atlas models those nodes jointly. Without those relationships, a project can match every one-way total and still energize a hall with no transformer behind it.
d = 2
What it depends on
Edges. A campus sits on a node; the node sits behind a 345 kV upgrade; the upgrade sits behind a transformer slot.
Why preserve it
Pairwise tables miss the three-way joint: this campus, this upgrade, this factory date.