stratum atlas
Inside AtlasExplore · Ask · Scenario · Report

Four surfaces. One decision loop.

Explore the universe. Ask a capital question. Stress a bind. Write the recommendation. Monitor what changes after you decide. That loop is the product.

Interconnection queues
ISO / RTO planning
Permit dockets
EIA-860 and EIA-930
PUC orders

The explorer above is a sample of the records Atlas draws on — examples, not the full catalog. Each source stays at its available grain and cadence. Gaps, irregular updates, and bias remain part of the system's limits — and of every report we write.

How it works

Four surfaces. One decision loop.

01 · Explore

Explore

Search the infrastructure universe — projects, markets, sponsors, nodes, and load books — without treating a printed pile as a named roster.

What this holds

Four surfaces. One decision loop.

Dependencies move together. A project is not a spreadsheet of independent columns.

Interconnection and equipment are not independent; neither are permits and construction. Atlas models those nodes jointly. Without those relationships, a project can match every one-way total and still energize a hall with no transformer behind it.

d = 2

What it depends on

Edges. A campus sits on a node; the node sits behind a 345 kV upgrade; the upgrade sits behind a transformer slot.

Why preserve it

Pairwise tables miss the three-way joint: this campus, this upgrade, this factory date.